For the Aquafina Bottling Plant, LEH delivered finishing and architectural works, MEP and waterproofing, all executed under international standards.
With our commitment to excellence and value engineering, we introduced a special mortar-based paint for industrial flooring that had never been imported or applied in Lebanon before.
Even in the face of extreme weather conditions during winter and a tight timeline schedule, we completed the project without interruption to other subcontractors’ works and with a high level of coordination.
Our ability to adapt to design changes and enhancements during execution while maintaining the schedule is a testament to our team’s expertise and collaboration. Through upgrading the structure of an existing building, we ensured that it met PepsiCo and international standards, leaving all parties involved satisfied with the final result.